Congratulations to the City of Kennewick, WA on the completion of their new 6.0 MG prestressed concrete tank. The new water storage reservoir replaces the City’s previous aging infrastructure, which was built in the 1950’s. PSE is proud to have been a part of the project team providing the structural design for the tank including an adjacent pump station. Our Executive Principal, Erik Peterson, P.E. (pictured far left), was in attendance at the ribbon cutting ceremony along with the project team and City officials.